The Rose MSCP, Kingston Upon Thames – Tremco
Modernise the Rose MSCP
11,000
TREMCO MMA Rapid Cure Flexible System and MMA Rapid Cure Internal System
Royal Borough of Kingston upon Thames
Hilton Abbey
The Project
The Rose Car Park required modernisation and TREMCO’s MMA system was specified for both the internal and external deck. The system which has ETAG accreditation is particularly well suited to projects that require a rapid turnaround as it has a cure time of just 30 minutes and a walk on time of 1 hour.
The Solution
The roof deck of the MSCP required a waterproofing layer which was applied once the existing bituminous waterproofing was removed. Approved TREMCO installer, Hilton Abbey coated the internal decks with the MMA internal system and painted the columns in a coordinated colour scheme to assist with easy visual navigation back to the correct parking levels for users.
The system is available in a range of standard colours, but bespoke options are also available. Work had to be carried out under a full closure initially but then as levels were completed, works were carried out under partial closure to ensure that as little disturbance as possible was caused to patrons. The rapid curing nature of this system facilitated the rapid turning around time.
TREMCO’s products were specified for this job because they have proven performance on jobs of a similar nature. Excellent technical advice and site support also meant that in conjunction with the fast curing properties of the system, it was the most suitable choice for the job.