Downloads

LRWA Brochures

LRWA Brochure Specifier
LRWA Brochure Contractor
LRWA Brochure Training

Guidance Notes

Guidance Note No 1 – Roof, Balcony and Walkway Inspection for the Specification of Liquid Applied Waterproofing Systems
Guidance Note No 2 – Substrates for Liquid Applied Waterproofing Systems for Roofs, Balconies and Walkways
Guidance Note No 3 – Generic Types of Liquid Applied Waterproofing Systems For Roofs, Balconies and Walkways
Guidance Note No 4 – Roof, Balcony and Walkway Refurbishment Using Liquid Waterproofing Systems
Guidance Note No 5 – Health and Safety Provision for Liquid Applied Waterproofing Systems on Roofs, Balconies and Walkways
Guidance Note No 6 – Safe Use of Liquid Applied Waterproofing Systems
Guidance Note No 7 – Specifier Guidance on Flat Roof Falls
Guidance Note No 8 – CE Marking of Liquid Applied Waterproofing Kits
Guidance Note No 9 – Waterproofing of Profiled Fibre Cement Sheet Roofing and Cladding
Guidance Note No 10 – Waterproofing of Metal Profiled Sheet Roofing and Cladding
Guidance Note No 11 – Use of Adhesives for Liquid Flat Roof Systems
Guidance Note No 12 – Termination of Waterproofing at Cills and Thresholds
Guidance Note No 13 – Drying of Existing Roof Substrates Prior to Installation of Liquid Waterproofing Systems 
Guidance Note No 14 – Best Practice for the Installation of Water Flow Reducing Layers
Guidance Note No 15 – Clarification of BS 6229 regarding thermal performance of Inverted and blue roof
Guidance Note No 16 – Walls Built onto Waterproofing Systems
Guidance Note No 17 – Best Practice for the Installation of a Flues Passing Through a Flat Roof

Guidance Notes – Flat Roof Sector

LRWA/NFRC/SPRA Guidance Note – Changes in Fire Safety Regulations 

SPRA_LRWA_NFRC Technical Guidance_Building Boards 

Guidance Notes – Coatings Industry

LRWA Information Note on Isocyanates Jan 22

Sustainability CPA Discussion & Briefing Papers

Discussion & Briefing Papers (constructionproducts.org.uk)

Technical Articles

Feature – Coatings for Protecting External Walls
Feature- Certification for Liquids BBA vs ETA
Feature – Liquid Waterproofing for Car Parks
Feature – CE marking for Liquids
Feature – Correct Selection of Liquid Waterproofing
Feature – Hot Melt
Feature – Using Liquid Waterproofing in Winter
Feature – Waste Management
Feature  – Liquid Waterproofing for Balconies
Merchants – Understanding Accreditations

Liquid Waterproofing Supplements – Roofing Today

Roofing Today Liquid Waterproofing Supplement 2018
Roofing-Today Liquid-Waterproofing-Supplement 2019
Roofing-Today-Liquid-Waterproofing-Supplement-2020
Roofing-Today-Liquid-Waterproofing-Supplement-2021
Roofing-Today-2022-Liquid-Waterproofing-Supplement

Roofing Today 2023 Liquid Waterproofing Supplement

Detail Drawings

Warm Roof 1 – Minimum 300mm Insulated Upstand
Warm Roof 2 – Typical External Gutter
Warm Roof 3 – Typical Movement Joint with Raised Kerbs
Warm Roof 4 – Typical Pipe Penetration
Warm Roof 5 – Typical Rooflight or Access Hatch
Warm Roof 6 – Typical Sumped Internal Outlet
Warm Roof 7 – Typical Watercheck
Inverted Roof 1 – Typical Balcony with Low Level Threshold
Inverted Roof 2 – Typical Insulated Parapet
Inverted Roof 3 – Typical Pipe Penetration

LRWA Design Guide for Specifiers

LRWA Design Guide for Specifiers – Roofs and Balconies 2020

Codes of Practice

Hot Melt Code of Practice
Car Park Code of Practice

Waste Management Guidance

Industry Assessment and Classification of Packaging Waste WP1 Rev1 (1)

Membership Documents

LRWA Membership Benefits 05.17

LRWA Awards and Gala Dinner

LRWA Sponsorship Brochure 2023

Data Protection

LRWA_Privacy and Cookies Policy Final 30.07.18

LRWA Policies

Anti-fraud and Corruption Policy
Conflict of Interest Policy
Diversity and Equal Opportunities Policy
Mission Statement
Modern Slavery and Human Trafficking Policy
Whistleblowing Policy
Anti-Bribery & Corruption Policy
Complaints Procedure
Malpractice & Maladministration policy.